Keeping it simple and clean: Old tiles removed and walls plastered to a good finish. New tiles on wall and new suite installed. New shower connected to high pressure pump in airing cupboard.
Using space the best possible way: All tiles removed and walls plastered. New tiles on wall with modern space saving suite installed. Towel Rail replaced with a modern chrome model.






Space saving and Modern: This was a tiny bathroom with an airing cupboard next to it. Cylinder was removed from the cupboard and installed in another room's cupboard. Airing cupboard was removed and bathroom extended. Bath moved to other side of the room and a digital shower installed. The picture on the end is the remote control for the shower. Tiles placed over all walls and floor tiles laid. Units with worktop installed and towel rail fitted.
